Skip to main navigation Skip to search Skip to main content

Studie zur Potentialfeldmessung an 40 Jahre alten Stahlbetonbauteilen vom Olympiastadion München: Einfluss des Elektrolytwiderstands und des Messrasters

Translated title of the contribution: Study of potential mapping at 40 year old reinforced elements from the Olympic stadium in Munich - Influence of concrete resistivity and grid size
  • Technical University of Munich

Research output: Contribution to journalArticlepeer-review

8 Scopus citations

Abstract

An essential part of the inspection and repair planning of reinforced concrete structures is the detection of corroding areas. Potential mapping is a widely used and established procedure to do this. But there are still some open questions concerning this measurement procedure. Which is the proper pre-wetting condition or which is the best time to measure when the structural element is exposed to weather conditions? Which is the optimal grid size? Investigations are made with a laboratory and practical test set up. For the practical test set up 40 year old, naturally corroded reinforced segments from the Olympic stadium in Munich are available and potential measurements under different condition were analyzed qualitatively.

Translated title of the contributionStudy of potential mapping at 40 year old reinforced elements from the Olympic stadium in Munich - Influence of concrete resistivity and grid size
Original languageGerman
Pages (from-to)620-629
Number of pages10
JournalBeton- und Stahlbetonbau
Volume108
Issue number9
DOIs
StatePublished - Sep 2013

Fingerprint

Dive into the research topics of 'Study of potential mapping at 40 year old reinforced elements from the Olympic stadium in Munich - Influence of concrete resistivity and grid size: Einfluss des Elektrolytwiderstands und des Messrasters'. Together they form a unique fingerprint.

Cite this