T1 - Seismic analysis of a transition tunnel constructed with TBM and mining method
AU - Yang, Song
AU - Li, Ruozhou
AU - Li, Pengyuan
AU - Wang, Chao
AU - Yu, Fei
AU - Yuan, Yong
AU - Yu, Haitao
N1 - Publisher Copyright:
© Published under licence by IOP Publishing Ltd.
PY - 2020/11/11
Y1 - 2020/11/11
N2 - A transition tunnel is generally built to connect a TBM tunnel and a mining tunnel, given the different cross sections associated with each construction method. The transition tunnel may be sensitive to earthquake damage since the tunnel cross-section and stiffness change along the tunnel axis. Studying the seismic performance of the transition tunnel structure, a subtle 3D finite element model is carried out. Comparing with the calculation results of SHAKE91, a reasonable non-reflective boundary condition is used. The concrete adopts an elastoplastic damage constitutive model, and the surrounding rock mass uses an elastoplastic constitutive model based on the Drucker-Prager yield criterion. The effects of different ground motion magnitudes and different types of seismic waves are calculated and analyzed through dynamic time-history method. The calculation results show that the impact range of the construction method butted composite lining section on the tunnel structure of the mine tunnel and the TBM tunnel is about 10m, and the reinforcement of the inner lining will cause a sudden change in the stress of the outside TBM tunnel structure. Moreover, the compressive stress of the surrounding rock and tunnel structure is small, and the structural damage mainly occurs in the area of the arch shoulder and arch foot.
AB - A transition tunnel is generally built to connect a TBM tunnel and a mining tunnel, given the different cross sections associated with each construction method. The transition tunnel may be sensitive to earthquake damage since the tunnel cross-section and stiffness change along the tunnel axis. Studying the seismic performance of the transition tunnel structure, a subtle 3D finite element model is carried out. Comparing with the calculation results of SHAKE91, a reasonable non-reflective boundary condition is used. The concrete adopts an elastoplastic damage constitutive model, and the surrounding rock mass uses an elastoplastic constitutive model based on the Drucker-Prager yield criterion. The effects of different ground motion magnitudes and different types of seismic waves are calculated and analyzed through dynamic time-history method. The calculation results show that the impact range of the construction method butted composite lining section on the tunnel structure of the mine tunnel and the TBM tunnel is about 10m, and the reinforcement of the inner lining will cause a sudden change in the stress of the outside TBM tunnel structure. Moreover, the compressive stress of the surrounding rock and tunnel structure is small, and the structural damage mainly occurs in the area of the arch shoulder and arch foot.
UR - http://www.scopus.com/inward/record.url?scp=85097144650&partnerID=8YFLogxK
U2 - 10.1088/1755-1315/570/4/042031
DO - 10.1088/1755-1315/570/4/042031
M3 - Conference article
AN - SCOPUS:85097144650
SN - 1755-1307
VL - 570
JO - IOP Conference Series: Earth and Environmental Science
JF - IOP Conference Series: Earth and Environmental Science
IS - 4
M1 - 042031
T2 - China Rock 2020 Conference
Y2 - 23 October 2020 through 26 October 2020
ER -