Abstract
In the present article, we analyze the production of fiber-reinforced plastics (FRP), specifically the production of components from preimpregnated fibers (prepregs), from the perspective of production planning and control (PPC). Consequently, requirements are developed, which serve as the basis for a new PPC system. Then we describe the corresponding system structure and suggest ways for its technical implementation.
Translated title of the contribution | Production control for the production of fiber-reinforced plastics - Production planning & control approach for the manufacturing of prepreg parts |
---|---|
Original language | German |
Pages (from-to) | 138-144 |
Number of pages | 7 |
Journal | WT Werkstattstechnik |
Volume | 102 |
Issue number | 3 |
State | Published - 2012 |