TY - JOUR
T1 - Montage, produktionsmanagement, produktionstechnik
T2 - Rekonfigurationsfähigkeit von betriebsmitteln: Kennzahlen zur bewertung der rekonfigurationsfähigkeit von montagebetriebsmitteln
AU - Karl, Florian
AU - Reinhart, Gunther
AU - Zäh, Michael F.
N1 - Publisher Copyright:
© Springer-VDI-Verlag GmbH & Co. KG, Düsseldorf.
PY - 2012
Y1 - 2012
N2 - The number of reconfigurations on assembly manufacturing resources rises continuously. In order to choose resources with the suitable reconfigurability, evaluation of reconfigurability is becoming more and more important. Therefore, a five-step methodology was developed. In this article the included key performance indicator system, on which evaluation is based, is presented. It contains economic and structural indices. Finally, the key performance indicator system is exemplarily demonstrated.
AB - The number of reconfigurations on assembly manufacturing resources rises continuously. In order to choose resources with the suitable reconfigurability, evaluation of reconfigurability is becoming more and more important. Therefore, a five-step methodology was developed. In this article the included key performance indicator system, on which evaluation is based, is presented. It contains economic and structural indices. Finally, the key performance indicator system is exemplarily demonstrated.
UR - http://www.scopus.com/inward/record.url?scp=85006964962&partnerID=8YFLogxK
M3 - Artikel
AN - SCOPUS:85006964962
SN - 1436-4980
VL - 102
SP - 228
EP - 233
JO - WT Werkstattstechnik
JF - WT Werkstattstechnik
IS - 4
ER -