Abstract
The experience gained by German Railways with slab track since 1972 forms the basis for the set of requirements for slab track construction. The article examines a number of points that are of importance for the long-term behaviour of slab track and which need to be taken into account in the design and construction of slab track on a soil subgrade.
Translated title of the contribution | Slab track on soil subgrade |
---|---|
Original language | German |
Pages | 33-37 |
Number of pages | 5 |
Volume | 48 |
No | 1 |
Specialist publication | Eisenbahningenieur |
State | Published - 1997 |