After more than 50 years of operation and a couple of retrofitting measures the sealing and the seepage measuring system of the Sylvenstein dam will be upgraded during 2011 and 2015. In this connection a 70 m deep diaphragm wall in the existing core and the subsoil of the dam was built in 2012. In progress of the construction works almost all of the downstream pore-pressure measuring points were destroyed. The observed measurements of the pore pressures in the core and the subsoil of the dam are the main part of the following article.
| Translated title of the contribution | Analysis of pore pressure measurements at the sylvenstein dam during the construction of the diaphragm wall in 2012 |
|---|---|
| Original language | German |
| Pages (from-to) | 31-35 |
| Number of pages | 5 |
| Journal | WasserWirtschaft |
| Volume | 103 |
| Issue number | 9 |
| DOIs | |
| State | Published - 2013 |
| Externally published | Yes |