Analyse der Porenwasserdruck-messungen am Sylvensteindamm während des Schlitzwandbaus 2012

Translated title of the contribution: Analysis of pore pressure measurements at the sylvenstein dam during the construction of the diaphragm wall in 2012

Andreas Bauer, Tobias Lang, Gregor Overhoff, Theodor Strobl

Research output: Contribution to journalArticlepeer-review

3 Scopus citations

Abstract

After more than 50 years of operation and a couple of retrofitting measures the sealing and the seepage measuring system of the Sylvenstein dam will be upgraded during 2011 and 2015. In this connection a 70 m deep diaphragm wall in the existing core and the subsoil of the dam was built in 2012. In progress of the construction works almost all of the downstream pore-pressure measuring points were destroyed. The observed measurements of the pore pressures in the core and the subsoil of the dam are the main part of the following article.

Translated title of the contributionAnalysis of pore pressure measurements at the sylvenstein dam during the construction of the diaphragm wall in 2012
Original languageGerman
Pages (from-to)31-35
Number of pages5
JournalWasserWirtschaft
Volume103
Issue number9
DOIs
StatePublished - 2013
Externally publishedYes