TY - JOUR
T1 - An integrated approach to analyze change-situations in the development of production systems
AU - Kernschmidt, Konstantin
AU - Behncke, Florian
AU - Chucholowski, Nepomuk
AU - Wickel, Martina
AU - Bayrak, Gülden
AU - Lindemann, Udo
AU - Vogel-Heuser, Birgit
N1 - Funding Information:
We thank the German Research Foundation (DFG) for funding this work as part of the collaborative research centre ‘Sonderforschungsbereich 768 – Managing cycles in innovation processes – Integrated development of product-service-systems based on technical products’ (SFB768).
PY - 2014
Y1 - 2014
N2 - This paper presents an integrated approach to analyze change-situations that occur during the development of production systems to support a holistic estimation of potential effects of engineering changes on the system itself as well as on future phases of the entire system lifecycle. For the analysis of change influences within the system, a SysML based methodology is provided, while the other lifecycle phases are equipped with checklists that support an expert estimation. The proposed integrated approach is applied to a production system for evaluation purposes.
AB - This paper presents an integrated approach to analyze change-situations that occur during the development of production systems to support a holistic estimation of potential effects of engineering changes on the system itself as well as on future phases of the entire system lifecycle. For the analysis of change influences within the system, a SysML based methodology is provided, while the other lifecycle phases are equipped with checklists that support an expert estimation. The proposed integrated approach is applied to a production system for evaluation purposes.
KW - Integrated change analysis
KW - Life cycle cost optimization
KW - Production system evolution
UR - http://www.scopus.com/inward/record.url?scp=84904459479&partnerID=8YFLogxK
U2 - 10.1016/j.procir.2014.01.081
DO - 10.1016/j.procir.2014.01.081
M3 - Conference article
AN - SCOPUS:84904459479
SN - 2212-8271
VL - 17
SP - 148
EP - 153
JO - Procedia CIRP
JF - Procedia CIRP
T2 - 47th CIRP Conference on Manufacturing Systems, CMS 2014
Y2 - 28 April 2014 through 30 April 2014
ER -