欧洲大陆同步电网"1•8"解列事故分析及启示

Translated title of the contribution: Analysis and Lessons of Disconnection Accident of Synchronous Power Grid in Continental European Area (on January 8, 2021)

Weimin Sun, Yichi Zhang, Xiaohan Zhang, Xuemin An, Jingzhe Tu, Jian He, Qinyong Zhou

Research output: Contribution to journalArticlepeer-review

14 Scopus citations

Abstract

On January 8, 2021, the synchronous power grid in the continental European area was divided into two regions: the northwest part and the southeast part. There were 1700MW interruptible loads having been cut off in France and Italy. About 70MW loads in the northwest area and about 233MW loads in the southeast area were cut off due to the extreme voltage and frequency variations. This paper introduces the general situation of the European power system, sorts out the development process of the accident, and summarizes the causes of this accident. Combining with the actual situation of China's power grid, it puts forward the enlightenment of this disconnection accident on the development of China's power system.

Translated title of the contributionAnalysis and Lessons of Disconnection Accident of Synchronous Power Grid in Continental European Area (on January 8, 2021)
Original languageChinese (Traditional)
Pages (from-to)2630-2637
Number of pages8
JournalPower System Technology
Volume45
Issue number7
DOIs
StatePublished - 5 Jul 2021
Externally publishedYes

Keywords

  • Blackout
  • Disconnection accident
  • European power grid
  • Synchronous power grid