Keyphrases
Permanent Method
95%
Concrete Pavement
47%
Ballastless Track
47%
Railway
36%
Slab Track
35%
Road Construction
35%
Structure-borne Noise
35%
Vibration Reduction
35%
Noise Reduction
35%
High-speed Line
29%
Long-term Performance
29%
Concrete Slab
29%
High-speed Train
27%
Subgrade
26%
Railway Track
23%
Carriageway
23%
Ballasted Track
23%
Subway
23%
Elasticity Theory
23%
Prefabricated Concrete
23%
Bridge Ends
23%
Load Dynamics
23%
Railway Tunnel Structure
23%
Cast-in-situ
23%
Pavement
23%
Traffic Load
23%
Roadbed
23%
Concrete Surface
23%
Mass-spring System
23%
Prefabricated Parts
23%
Long-time Behavior
20%
Concrete Road
17%
Imperfection
17%
Ballast Track
17%
Protective Layer
17%
Sleeper
17%
Running Surface
17%
Suspension System
15%
Matting
15%
Deflection
15%
Wheel Load
15%
Railway Line
15%
Bituminous Pavement
11%
Multilayer Constructions
11%
Germany
11%
Modulus of Subgrade Reaction
11%
Constructional Method
11%
Thick Concrete
11%
Technical Maturity
11%
Airborne Noise
11%
Engineering
Railway
100%
Base Course
53%
Road
53%
Concrete Pavements
47%
Pavement
47%
Slab Track
41%
Tunnel
39%
Subgrade
32%
Ballasted Track
29%
Joints (Structural Components)
29%
Term Behavior
26%
Concrete Surface
23%
Road Construction
23%
Subways
23%
Term Performance
23%
Suspension System
17%
High Speed Line
17%
Subsurface
17%
Protective Layer
17%
Bearing Capacity
14%
Concrete Slabs
13%
Alternative Form
11%
Axle Load
11%
Practical Significance
11%
Lightweight Concrete
11%
Load Ratio
11%
Structural Element
11%
Test Section
11%
Bending Moment
11%
Rigidity
11%
Contact Area
11%
Dynamic Loads
11%
Dimensioning
11%
Critical Section
11%
Interdependence
11%
Research Work
11%
Dynamic Behavior
11%
Rail Tunnels
11%
Rural Roads
11%
Running Speed
11%
Ballast Bed
11%
Grinding (Machining)
11%
Joining
11%
Federal Republic
11%
Elastic Deformation
11%
Deformation Behavior
11%
Mass-Spring System
11%
Insulating Layer
11%
Rail Steel
11%
Mathematical Model
11%