Projects per year
Search results
-
Active
AM2PM: Additive to Predictive Manufacturing for Multistorey Construction Using Learning by Printing and Networked Robotics
Borrmann, A. (PI)
1/10/24 → 30/09/28
Project: Research
-
AI4CADCAM: AI-based processing of CAD models for automated planning of computer-aided manufacturing
Borrmann, A. (PI)
1/02/24 → 31/01/27
Project: Research
-
OptiGeoS: OptiGeoS - Optimierung von geschlossenen oberflächennahen geothermischen Systemen
Hamacher, T. (PI), Ulbrich, M. (CoPI) & Zosseder, K. (CoPI)
1/01/24 → 31/12/26
Project: Research
-
-
BauPuls360: Öffentliche Dienstleistungsplattform der mittelständischen Bauwirtschaft:
Borrmann, A. (PI)
1/01/24 → 31/12/26
Project: Research
-
Generic framework for simulating and executing robotized construction – General architecture and information backbone
Borrmann, A. (PI)
1/01/24 → …
Project: Research
-
Energetisch-ökologische Analyse großer Gebäudebestände
Lang, W. (PI) & Banihashemi, F. (CoI)
1/08/23 → 31/12/25
Project: Research
-
CircularFTmehrRAUM
Lang, W. (PI), Takser, I. (CoI), Theilig, K. (CoI) & Deghim, F. (CoI)
1/06/23 → 30/06/25
Project: Research
-
BauKlima - Kommunal
Lang, W. (PI), Präger, L. (CoI) & Woytowicz, J. (CoI)
1/04/23 → 31/03/26
Project: Research
-
PredictiveModeling: AI-based automation of repetitive design steps in BIM modeling
Borrmann, A. (PI)
1/03/23 → 28/02/27
Project: Research
-
TU&M: Timber Use and Maintain (TU&M): Development and assessment of circular woodframed building elements
Fröhling, M. (PI), Winter, S. (PI), Benz, J. P. (PI), Birk, S. (PI), Petzold, F. (PI) & van de Kuilen, J. W. (PI)
1/02/23 → 31/01/26
Project: Research
-
DigiTwinRoadNet: Digital Twin für den Betrieb der bayerische Straßeninfrastruktur
Borrmann, A. (PI)
1/05/22 → 30/04/25
Project: Research
-
DrawOn: KI-basierte Analyse von Bauplänen zur Automatisierung des Projektdatenmanagements in komplexen Bauvorhaben
Borrmann, A. (PI)
1/03/22 → 31/05/25
Project: Research
-
GRK 2679: Urban Green Infrastructure – Training Next Generation Professionals for Integrated Urban Planning Research
Pauleit, S. (PI), Egerer, M. (CoPI), Helmreich, B. (CoPI), Kollmann, J. (CoPI), Pretzsch, H. (CoPI), Schloter, M. (CoPI), Weißer, W. (CoPI), Wulfhorst, G. (CoPI), Kögel-Knabner, I. (CoPI), Lang, W. (CoPI), Ludwig, F. (CoPI), Michaeli, M. (CoPI), Traidl-Hoffmann, C. (CoPI), Rötzer, T. (CoPI), Fairbairn, A. (CoI), Baghaiepoor, M. (CoI), Micklewright, J. (CoI), Alim, I. (CoI), Fakirova, E. (CoI), Yazdi, H. (CoI), Reitberger, R. (CoI), Banihashemi, F. (CoI), Pattnaik, N. (CoI), Parhizgar, L. (CoI), Trost, C. (CoI), Páez-Curtidor, N. (CoI), Porter, L. (CoI), Nulkar, S. (CoI), Berger, N. (CoI), Rahman, M. (CoI) & Reischl, A. (CoI)
1/01/22 → …
Project: Research
-
Development of a consistent digital process chain from an adaptable modular bridge design to intelligent additive manufacturing utilising cyber-physical systems
Borrmann, A. (PI) & Fischer, O. O. (CoPI)
1/01/22 → …
Project: Research
-
C04 - Integrating Digital Design and Additive Manufacturing through BIM-Based Decision Support and Digital Twin Methods
Li, C. (CoI) & Petzold, F. (PI)
1/01/20 → 31/12/27
Project: Research
-
Complex bridge structures assembled by utilising facetted planar elements made of carbon-reinforced ultra-high performance concrete - Graph-based modularisation and trajectory-sensitive production
Borrmann, A. (PI) & Fischer, O. O. (CoPI)
1/01/19 → …
Project: Research
-
Representation and management of digital building models with multiple detailing levels
Borrmann, A. (PI)
1/01/16 → …
Project: Research
-
Projektplattform Energie + Innovation
Lang, W. (PI), Kaiser, I. (CoI) & Haseloff, S. (CoI)
1/02/14 → …
Project: Research