Towards collection, processing and use of actual data for process simulation during construction

T. Horenburg, J. Wimmer, W. A. Günthner, A. Borrmann, G. Dori

Publikation: Beitrag in Buch/Bericht/KonferenzbandKonferenzbeitragBegutachtung

4 Zitate (Scopus)

Abstract

Construction projects in urban areas imply multiple activities on limited work space and hence lead to interferences and delays depending on the quality of the planning. Due to the increasing competition in construction industry an immediate reaction to these problems is crucial. This paper introduces a comprehensive approach for construction planning utilizing process simulation and VR-visualization to address the issues mentioned. By monitoring the construction progress actual state data is generated to update simulation parameters and corresponding results for future construction realization. Therefore a detailed concept was developed to process the various types of raw (actual) data in order to receive information about the construction progress. Furthermore this paper introduces a design for simulation and visualization environments to interpret actual data. Hence temporal and spatial collisions can be detected before execution and profound measures taken respectively.

OriginalspracheEnglisch
TitelEuropean Group for Intelligent Computing in Engineering, EG-ICE 2012 - International Workshop
UntertitelIntelligent Computing in Engineering
Redakteure/-innenAndre Borrmann, Yaqub Rafiq, Philipp Geyer, Pieter de Wilde
Herausgeber (Verlag)Universiteit Twente
ISBN (elektronisch)9783000384554
PublikationsstatusVeröffentlicht - 2012
Veranstaltung19th International Workshop of the European Group for Intelligent Computing in Engineering, EG-ICE 2012 - Herrsching, Deutschland
Dauer: 4 Juli 20126 Juli 2012

Publikationsreihe

NameEuropean Group for Intelligent Computing in Engineering, EG-ICE 2012 - International Workshop: Intelligent Computing in Engineering

Konferenz

Konferenz19th International Workshop of the European Group for Intelligent Computing in Engineering, EG-ICE 2012
Land/GebietDeutschland
OrtHerrsching
Zeitraum4/07/126/07/12

Fingerprint

Untersuchen Sie die Forschungsthemen von „Towards collection, processing and use of actual data for process simulation during construction“. Zusammen bilden sie einen einzigartigen Fingerprint.

Dieses zitieren