Cycle Planning, or Takt Time Planning, is a key method to reduce the variability between different activities within the execution of a construction. A construction section such as a floor consists of multiple work zones, which should have continuous flow and similar cycle times to efficiently coordinate needed resources. However, for concrete structures it is often difficult to find suitable sizes of casting segments and their grouping to work zones. Nowadays, scheduling experts usually use their practical experience to find an intuitive solution for Cycle Planning, which might be sub-optimal. The objective of our research is thus to develop a semiautomatic method to generate optimal work zones for a cycle. The proposed solution is a BIM-based Cycle Planning concept for the cast in-situ construction method of walls. This paper lays the foundation for our concept and evaluates different designs of Cycle Planning layouts to ensure the practical relevance of the generated work zones. We provide an approach to the semiautomatic method: after splitting all wall objects into smaller sections, an optimization algorithm aggregates wall sections into casting segments and casting segments into work zones.

OriginalspracheEnglisch
TitelIGLC 2018 - Proceedings of the 26th Annual Conference of the International Group for Lean Construction
UntertitelEvolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers
Redakteure/-innenVicente A. Gonzalez
Herausgeber (Verlag)The International Group for Lean Construction
Seiten58-67
Seitenumfang10
ISBN (elektronisch)9789380689296
DOIs
PublikationsstatusVeröffentlicht - 2018
Veranstaltung26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers, IGLC 2018 - Chennai, Indien
Dauer: 16 Juli 201822 Juli 2018

Publikationsreihe

NameIGLC 2018 - Proceedings of the 26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers
Band1

Konferenz

Konferenz26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers, IGLC 2018
Land/GebietIndien
OrtChennai
Zeitraum16/07/1822/07/18

Fingerprint

Untersuchen Sie die Forschungsthemen von „Evaluation of a case study to design a BIM-based cycle planning concept“. Zusammen bilden sie einen einzigartigen Fingerprint.

Dieses zitieren