Zur Hauptnavigation wechseln Zur Suche wechseln Zum Hauptinhalt wechseln

计及交通流量动态变化的配电网灾后修复多时间断面优化策略

  • Haiyang Wan
  • , Wenxia Liu
  • , Qingxin Shi
  • , Jian He
  • , Weimin Sun
  • , Xiaohan Zhang
  • North China Electric Power University
  • China Electrical Power Research Institute

Publikation: Beitrag in FachzeitschriftArtikelBegutachtung

19 Zitate (Scopus)

Abstract

Aiming at the influence of the dynamic change characteristics of traffic flow on the fault recovery process of distribution network under extreme disasters, in the background of the coupling of the power grid and transportation network, considering the coordination and scheduling between mobile and fixed emergency recovery resources and fault repair, a multi-time-section optimization strategy for the post-disaster fault recovery of the distribution network is proposed. Firstly, the cell transmission model is used to establish the transportation network model, which can predict the traveling time of the road repair crews and mobile energy storage vehicles. Secondly, a mixed-integer linear programming model is established, which aims at minimizing the load reduction amount and the scheduling cost of restoration resources, and takes the emergency repair sequence of faulty equipment and the scheduling plan of restoration resources as decision variables. The multi-time-section optimization method is used to solve the model. In addition, a method for dynamic reconfiguration of grids is proposed. By adding a virtual root node to form a virtual island with each power loss node, and dynamically adding and deleting the number of nodes in the island with the change of the grid, it is ensured that the entire distribution network can always meet the radial constraints, and the adaptability of the algorithm to fault scenarios is improved. Finally, examples are used to verify the effectiveness of the proposed method in improving the resilience of the distribution network.

Titel in ÜbersetzungMultiple-time-section Optimization Strategy for Post-disaster Recovery of Distribution Network Considering Dynamic Changes of Traffic Flow
OriginalspracheChinesisch (traditionell)
Seiten (von - bis)119-129
Seitenumfang11
FachzeitschriftDianli Xitong Zidonghua/Automation of Electric Power Systems
Jahrgang46
Ausgabenummer12
DOIs
PublikationsstatusVeröffentlicht - 25 Juni 2022
Extern publiziertJa

Fingerprint

Untersuchen Sie die Forschungsthemen von „计及交通流量动态变化的配电网灾后修复多时间断面优化策略“. Zusammen bilden sie einen einzigartigen Fingerprint.

Dieses zitieren